Tesla Powerwall 2 batteries charged using off peak electricity (CP1139)
Date: 27th Apr 2019
The project was led by NEA and North Devon Homes Ltd and had the following aims:
- Install Tesla Powerwall 2 domestic battery systems in eight socially rented homes in North Devon without solar PV where the batteries charge only from the electricity grid.
- Assess the performance of the 13.5kWh Tesla Powerwall 2 batteries when grid charging
- Assess levels of resident satisfaction with the technology
- Determine the battery performance over about a year and quantify the savings for the residents from the batteriesConsider any challenges associated with deployment and operation of the technology when charging with time of use tariffs.